We visit your premises, assess what’s actually possible inside your building, and give you a realistic scope, timeline, and cost before you commit to anything.
Have questions? We’ve answered some of the most common ones below.
Timelines vary by project scope. A residential build typically takes 4–8 months, while commercial projects can range from 6–18 months. We provide a detailed timeline at the start of every project.
Yes, we manage all necessary building permits, regulatory approvals, and compliance documentation on your behalf, so you don’t have to worry about the paperwork.
We operate across all 5 boroughs of New York City. Contact us to confirm availability in your area.
We work on projects of all sizes — from small home renovations to large commercial developments. Every project gets the same level of dedication and professionalism.
A remodel updates finishes and fixtures while keeping the existing layout and utility locations. A gut renovation removes everything to the studs and reconfigures the space from scratch. Gut renovations offer maximum flexibility but require permits and longer timelines.