Transforming NYC homes with custom kitchen renovations. From Manhattan luxury to Brooklyn brownstones, we provide licensed, full-service remodeling designed to increase your property value.
"A kitchen renovation is not just construction — it is a carefully sequenced series of decisions, each one building on the last."
— Multi Construction Co.
We manage every phase of your kitchen remodel in-house — no subcontractor hand-offs, no accountability gaps. Here’s everything within our scope.
01
Layouts built around how you actually cook — work triangle efficiency, traffic flow, and storage needs resolved before a single cabinet is ordered.
02
Built to your kitchen's exact dimensions. Designed as permanent architectural features, maximizing storage where every inch matters.
03
Quartz, marble, granite, and porcelain slab. Selection guided by cooking habits, maintenance preferences, and budget — not just appearance.
04
All plumbing and gas work managed in-house. Rerouting, shutoff access, and NYC DOB compliance handled from day one of planning.
05
Dedicated circuits, load planning, under-cabinet lighting, and appliance specs coordinated together for safe, code-compliant operation.
06
Ducted and recirculating systems planned around your building's exterior access constraints — assessed and spec'd before construction begins.
07
Surface layouts finalized before installation. Tile alignment, grout sizing, and edge transitions planned and reviewed with you.
08
NYC DOB filings, co-op and condo alteration agreements, and managing agent coordination — all prepared and tracked by our team.
The construction process begins after every decision has been finalized.
We visit your home to assess structural conditions, utility locations, building type, and access constraints. We discuss goals, cooking habits, storage needs, and budget range.
Layout developed, materials specified, appliances selected. 3D visualization tools confirm decisions before anything is ordered. All elements are finalized at this stage.
All NYC DOB permit applications and board alteration documents prepared and filed. We track the review process and follow up proactively.
Planning decisions are carried directly into construction by one accountable team, preserving intent under real jobsite conditions.
Thorough walkthrough before the project closes. All outstanding items resolved, permits closed with NYC DOB, and full documentation provided to you.
Kitchens perform differently depending on the building. Each type introduces limits that must be addressed early by a qualified kitchen renovation contractor in NYC.
Older systems are upgraded carefully while respecting structural conditions.
Layouts are refined for efficiency, access, and modern appliance requirements.
Vertical services, ventilation paths, and load limits are planned with foresight by kitchen remodeling contractors in NYC.
01
Planning responds to real conditions, reducing changes during construction.
02
Design and construction are managed under one accountable structure.
03
Our experience informs decisions shaped by access, approvals, and daily use.
04
Materials are chosen for heavy use and long-term performance.
05
Projects move forward with confidence rather than correction.
Home renovation in NYC, planned to a build-ready level before construction begins.
Slide To Explore
A complete renovation of a Brooklyn townhouse brownstone, transforming an outdated interior into a modern, elegant living space while preserving its classic character.
A full renovation of a prewar commercial space in Manhattan’s Upper West Side was transformed into a fully equipped wine and liquor store with optimized retail and storage design.
A complete renovation of a two-story corporate office, transforming the space into a modern, functional workplace with glass-partitioned rooms and upgraded interiors.
A Brooklyn loft apartment renovation blending industrial heritage with modern interior design, creating a refined yet inviting living space.
A complete brownstone renovation in Brooklyn featuring full interior design, structural upgrades, and high-end kitchen and bathroom transformations.
A full gut renovation project transforming the entire property into a modern, functional, and high-quality living space from the ground up.
A comprehensive remodeling project covering both structural and finishing work across the 1st and 2nd floors, including interior upgrades, flooring, and exterior roofing improvements.
A full interior renovation focused on modernizing the kitchen and bathroom, complemented by upgraded flooring and high-quality finishing throughout the space.
A complete kitchen and bathroom renovation combined with structural upgrades, flooring refinishing, and full interior finishing across the entire space.
A full interior renovation of a Bedford Stuyvesant house, covering structural upgrades, kitchen and bathroom remodeling, plumbing improvements, and complete stair reconstruction.
We visit your premises, assess what’s actually possible inside your building, and give you a realistic scope, timeline, and cost before you commit to anything.
Have questions? We’ve answered some of the most common ones below.
A cosmetic refresh takes three to five weeks. A mid-range remodel runs six to ten weeks. A full gut renovation generally takes twelve to sixteen weeks from permit approval. Permit processing and custom material lead times are the most common sources of extension.
Most renovations involving plumbing, gas, or electrical work require NYC DOB permits. A simple cosmetic update — new paint, cabinet refacing, appliance swap without utility changes — generally does not. We advise you at consultation and handle all filings.
Yes, in virtually all cases. Co-ops and condos require an alteration agreement with contractor insurance certificates, scope documentation, and sometimes architectural drawings. We prepare this documentation as part of our standard process.
For cosmetic work or phased renovations, many clients remain in their homes. For full gut renovations with extended periods without running water, gas, or electricity, temporary relocation is generally more practical. We discuss this during planning so you can prepare.
A remodel updates finishes and fixtures while keeping the existing layout and utility locations. A gut renovation removes everything to the studs and reconfigures the space from scratch. Gut renovations offer maximum flexibility but require permits and longer timelines.