A fresh coat of paint looks the same on day one regardless of who applied it. The difference shows at six months — in the peeling, the streaking, and the patches that never quite disappeared. Multi-Construction Co. has been delivering professional painting services across New York City since 1989, in apartments, brownstones, offices, and commercial spaces. The difference is what happens before the first coat goes on.
"It is more than a passion project. It is more than a creative vision realized. It is Multi."
— Multi Construction Co.
Every discipline below is managed directly by our team and sequenced around one priority: keeping your project on schedule without compromising the quality or compliance of the result.
01
Walls, ceilings, and trim are reviewed before any work begins. Cracks, moisture damage, uneven patches, and adhesion problems are identified and corrected — not painted over.
02
Primers and coatings are selected based on surface type, environment, and use. The right system for a pre-war plaster wall is not the same as the right system for a commercial corridor.
03
Paint is applied with consistent coverage and controlled method. Streaking, lap marks, and uneven sheen are preparation and application failures — both are addressed before a room is considered complete.
04
Edges, transitions, and detailed elements are handled deliberately. Clean lines at trim and ceiling junctions are where the quality of a paint job is most visible — and most often compromised.
05
Where applicable, exterior surfaces and shared building areas are prepared and coated for weather resistance and durability under NYC building conditions.
06
Floors, fixtures, and adjacent surfaces are fully protected before work begins. Clean execution is treated as part of the finish — not a courtesy.
07
Color selections, finish types, and sheen levels are reviewed across every surface before application begins. A wall color that reads correctly in isolation can shift significantly under different lighting conditions or against adjacent trim.
08
Every painted surface is reviewed under proper lighting before project closeout. Touch-ups and corrections are completed as standard — not left to the client to identify afterward.
The construction process begins after every decision has been finalized.
We assess existing conditions, identify repair needs, and establish scope before scheduling begins. Surface condition determines the preparation required — that is established first.
Surfaces are repaired, primed, and made ready for paint. This phase is not compressed to accelerate the schedule. Drying times are respected because the finish depends on them.
Coatings are applied using methods appropriate to the surface and environment. Coverage, consistency, and edge control are maintained throughout.
Finished surfaces are reviewed, corrected where needed, and delivered cleanly. Basic maintenance guidance is provided to extend the life of the finish.
Thorough walkthrough before the project closes. All outstanding items resolved, permits closed with NYC DOB, and full documentation provided to you.
Painting services in NYC cover an enormous range of space types, use cases, and building contexts. Our experience spans the full range of what New York City buildings and houses occupy.
Occupied spaces are painted with planned sequencing and minimal disruption. Building access requirements and board rules are coordinated before work begins.
Original plaster, older substrates, and period trim require careful preparation. Surface behavior in these buildings is assessed before product selection — not after problems appear.
Work is scheduled around business hours and operational requirements. Commercial environments also require coatings rated for higher-traffic durability than standard residential products.
01
Renovation plans are developed with actual structural and building constraints in mind, which reduces revisions once construction is underway.
02
Planning, coordination, and construction are managed under one accountable team — eliminating the hand-offs that cause miscommunication and delay.
03
Decades of experience with apartments, co-ops, condos, and brownstones informs every decision we make.
04
Finishes are chosen for durability and long-term behavior—not short-term visual appeal.
05
Structured oversight and consistent communication keep every project controlled from start to finish.
Our renovation work in NYC, planned to a build-ready level before construction begins.
Slide To Explore
A complete renovation of a Brooklyn townhouse brownstone, transforming an outdated interior into a modern, elegant living space while preserving its classic character.
A full renovation of a prewar commercial space in Manhattan’s Upper West Side was transformed into a fully equipped wine and liquor store with optimized retail and storage design.
A complete renovation of a two-story corporate office, transforming the space into a modern, functional workplace with glass-partitioned rooms and upgraded interiors.
A Brooklyn loft apartment renovation blending industrial heritage with modern interior design, creating a refined yet inviting living space.
A complete brownstone renovation in Brooklyn featuring full interior design, structural upgrades, and high-end kitchen and bathroom transformations.
A full gut renovation project transforming the entire property into a modern, functional, and high-quality living space from the ground up.
A comprehensive remodeling project covering both structural and finishing work across the 1st and 2nd floors, including interior upgrades, flooring, and exterior roofing improvements.
A full interior renovation focused on modernizing the kitchen and bathroom, complemented by upgraded flooring and high-quality finishing throughout the space.
A complete kitchen and bathroom renovation combined with structural upgrades, flooring refinishing, and full interior finishing across the entire space.
A full interior renovation of a Bedford Stuyvesant house, covering structural upgrades, kitchen and bathroom remodeling, plumbing improvements, and complete stair reconstruction.
We visit your premises, assess what’s actually possible inside your building, and give you a realistic scope, timeline, and cost before you commit to anything.
Have questions? We’ve answered some of the most common ones.
Older plaster, moisture infiltration, and multiple layers of previous paint create adhesion and surface conditions that standard preparation doesn’t address. These buildings require surface-specific assessment before primer or paint is selected.
A properly prepared and applied interior paint job in a residential space should last seven to ten years under normal conditions. Premature failure — peeling, cracking, uneven fading — is almost always a preparation or product selection failure, not a paint quality issue.
Yes. Sequencing is planned to keep disruption contained to one area at a time. Low-VOC products are used in occupied spaces where ventilation is limited.
Yes. Sheen levels, finish types, and product systems are selected based on surface condition and use — not just aesthetic preference. The wrong sheen in the wrong environment is a maintenance problem.
Paint does not fail. Preparation fails — and paint follows whatever surface is beneath it.
The most common complaints after a painting job in New York City are not about color. They are about finish inconsistency, visible patch lines, peeling at edges, and surfaces that looked acceptable on completion day but showed problems within months. Every one of those outcomes traces back to the same cause: surfaces that were not properly assessed, repaired, and primed before paint was applied.